Overview
The containerized LNG refueling station is a fully integrated, mobile cryogenic fueling system housed within a standard ISO container frame.
Technical Specifications
|
Module |
Key Specification |
|
Capacity Options |
20ft: 15,000 L / 40ft: 31,500 L (ISO container footprint) |
|
Operating Pressure Range |
0.8 – 1.6 MPa |
|
Flow Performance |
45 – 120 L/min (single or dual nozzle) |
|
Refueling Speed |
500 L truck tank filled within ≤ 5 minutes |
|
Boil-Off Rate (BOG) |
< 0.18% per 24 hours at 20°C |
|
Pump System |
Submerged cryogenic pump, up to 220 L/min @ 1.8 MPa |
|
Maintenance Interval |
Approx. 4,000 operating hours |
|
Power Requirements |
380V/480V, 3-phase, 50/60Hz |
|
Peak Power Consumption |
≤ 22 kW (dual-nozzle simultaneous operation) |
Key Features
On-Site Commissioning (<48 Hours): Cryogenic tank, submerged pump, vacuum piping, vaporizer, and dispenser are pre-piped, pre-wired, and factory-tested within a single ISO enclosure to minimize site-work costs.
17-Day Ventless BOG Retention: Integrated automated boil-off gas (BOG) re-condensation loop maintains internal pressure below design limits during standby, eliminating atmospheric venting for up to 17 continuous days.
Ambient Adaptation (-40°C to +50°C): Engineered for continuous rated LNG output across extreme temperature ranges without requiring auxiliary ambient utility heating or external cooling infrastructure.
Direct-on-Grade Installation: Self-supporting structural steel container frame distributes mechanical loads evenly, allowing direct placement on engineered gravel pads or asphalt without poured-concrete foundations.
Practical Applications

Logistics Corridors: Heavy-duty trucking terminals and freight refueling hubs.
Marine & Ports: Marine bunkering stations for LNG-powered vessels and port authority fleets.
Mining & Off-Grid Power: Fueling infrastructure for mining haul fleets and localized gas-fired power generation units.
Fleet Transition: Temporary or interim fueling setups for commercial transport fleets undergoing alternative fuel trials.
Standardized Component Interchangability: Built exclusively with field-proven cryogenic hardware, including RegO valves, Cryostar pumps, Flowserve actuators, and Emerson Rosemount transmitters.
Safety & Lifecycle Support
Fail-Safe PLC & <2.0s ESD Isolation: Driven by a Siemens S7-1500 fail-safe PLC with industrial gas-control logic; multi-point Emergency Shutdown (ESD) isolates the cryogenic core via pneumatic valves in less than 2.0 seconds.
Remote Telemetry & Gas Detection: Integrated methane and flame sensors paired with cellular gateways for real-time remote monitoring of tank levels, vacuum pressure, and leak alerts.
Commercial Procurement Terms: Minimum Order Quantity (MOQ) of 1 unit, with a fixed factory lead time of 16 weeks from formal engineering drawing sign-off to FOB port delivery.
10-Year Parts Availability: Minimum 10-year factory availability guarantee on all custom structural components, with 48-hour air-freight dispatch for standard wear-and-tear seals and valves.
Annual Production Capacity: Dedicated cryogenic manufacturing facility with an established throughput of 120 completed containerized systems per year to support multi-unit procurement schedules.
Certifications & Compliance
International Pressure Vessel Codes
Manufactured, stamped, and third-party verified under ASME Section VIII Division 1, CE-PED 2014/68/EU, and EN 13458 standards.
Hazardous Area Certification
All onboard electrical systems, junction boxes, and instrumentation loops carry independent ATEX Zone 1/Zone 2 or IECEx certifications.
Quality Assurance & Traceability
100% Non-Destructive Testing (NDT), including Radiographic Testing (RT) and Ultrasonic Testing (UT), backed by digital Mill Test Certificates (MTC).
FAQ
Q: What real-world deployments does the containerized LNG station currently operate in?
A: The system has been deployed in heavy-duty logistics corridors and remote mining fueling points with continuous operation cycles exceeding 18 months.
Q: Has the system been independently tested by third-party certification bodies?
A: Yes, select configurations have undergone validation by internationally recognized inspection agencies such as BV and SGS for pressure integrity and leakage performance. Each tested unit is assigned a traceable inspection report ID for procurement audits.
Q: What is the expected performance degradation after long-term operation?
A: After approximately 8,000 operating hours, pump efficiency typically declines by less than 3.5%, mainly due to seal wear. Scheduled maintenance intervals are designed to restore performance to near-original levels.
Q: How is system safety verified under emergency shutdown scenarios?
A: Full ESD simulation tests are performed quarterly, verifying complete isolation of cryogenic flow within 1.8–2.0 seconds. These include valve response timing and pressure stabilization verification under load.
Q: What is the total cost of ownership over a 10-year lifecycle?
A: Estimated 10-year lifecycle cost is typically 22–28% lower than traditional fixed LNG stations due to reduced civil construction and lower downtime.
Q: How long does full commissioning take from delivery to operation?
A: Standard commissioning requires 36–48 hours including pressure calibration, leak verification, and control system synchronization.
Q: What operational environments has the system been validated in?
A: Field tests include Arctic cold-start conditions down to -38°C and desert operations up to +52°C ambient temperature.
Q: What kind of maintenance schedule is recommended for continuous operation?
A: Preventive maintenance is recommended every 4,000 operating hours, focusing on pump seals, vaporizer efficiency, and sensor recalibration.
Q: How is telemetry data secured and transmitted to operators?
A: All remote monitoring data is encrypted using industrial-grade TLS protocols with optional private APN deployment. Systems can integrate with SCADA platforms without exposing raw control logic externally.
Q: What spare parts logistics support is available globally?
A: Critical components such as valves, sensors, and pump seals are stocked for 10+ years with global air shipment within 48 hours. Standardized part numbers ensure cross-regional interchangeability.
Hot Tags: containerized LNG refueling station, China containerized LNG refueling station manufacturers, Containerized LNG Refueling Station, LNG Fueling Pump Skid, LNG Refuelling Station, Single gun LNG Dispenser, Skid mounted LNG Refueling Device, Vertical LNG Cryogenic Storage Tank

